{"id":2106,"date":"2021-01-18T04:50:32","date_gmt":"2021-01-18T04:50:32","guid":{"rendered":"http:\/\/wheelsprocket.xyz\/?p=2106"},"modified":"2021-01-18T04:50:32","modified_gmt":"2021-01-18T04:50:32","slug":"energy-units-for-double-scissors-lift","status":"publish","type":"post","link":"https:\/\/wheelsprocket.xyz\/uk\/application\/energy-units-for-double-scissors-lift\/","title":{"rendered":"Energy UNITS FOR DOUBLE-SCISSORS LIFT"},"content":{"rendered":"<p>General Description<br \/>Outfitted with the zero leak bidirectional checking sole-noid valves,  this  energy  unit  is  built for that operation of  two independent circuits.  Which  are  respectively for the primary and subordinate platforms from the double scissors lift. Two  cut-off  valves are utilized for reducing the machine manually in situation of electrical power loss. If more independent circuits are needed for the application please contact us for availability.<br \/>Remark:  1. Please seek advice from our product sales engineer for the distinct pump displacement, motor power or tank capability.<br \/>2. CSA or UL licensed motors can be found upon request.<br \/><img decoding=\"async\" src=\"https:\/\/img.hzpt.com\/1207\/POWER%20UNITS%20FOR%20DOUBLE-SCISSORS%20LIFT.jpg\" align=\"right\" width=\"252\" style=\"padding:10px;\"\/>Distinctive Notes<br \/>1.\tThe AC motor is of S3 duty cycle, which can only work intermittently and repeatedly, i.e., 1minute on and 9 minutes off.<br \/>two.\tClean all the hydraulic components concerned prior to set up of  the energy unit.<br \/>three.\tViscosity in the oil shoud be 15~46 cst,plus the oil really should be clean and cost-free of impurities,N46 hydraulic oil is encouraged.<br \/>4.\tThe energy unit should really be mounted vertically.<br \/>five.\tCheck the oil degree within the tank after the first working in the electrical power unit.<br \/>six.\tOil changing is needed right after the first one hundred operation hrs,afterwards after every 3000 hours.<\/p>","protected":false},"excerpt":{"rendered":"<p>General DescriptionOutfitted with the zero leak bidirectional checking sole-noid valves, this energy unit is built for that operation of two independent circuits. Which are respectively for the primary and subordinate platforms from the double scissors lift. Two cut-off valves are utilized for reducing the machine manually in situation of electrical power loss. If more independent [&hellip;]<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":true,"template":"","format":"status","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-2106","post","type-post","status-publish","format-status","hentry","category-uncategorized","post_format-post-format-status"],"_links":{"self":[{"href":"https:\/\/wheelsprocket.xyz\/uk\/wp-json\/wp\/v2\/posts\/2106","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wheelsprocket.xyz\/uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wheelsprocket.xyz\/uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wheelsprocket.xyz\/uk\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/wheelsprocket.xyz\/uk\/wp-json\/wp\/v2\/comments?post=2106"}],"version-history":[{"count":1,"href":"https:\/\/wheelsprocket.xyz\/uk\/wp-json\/wp\/v2\/posts\/2106\/revisions"}],"predecessor-version":[{"id":2107,"href":"https:\/\/wheelsprocket.xyz\/uk\/wp-json\/wp\/v2\/posts\/2106\/revisions\/2107"}],"wp:attachment":[{"href":"https:\/\/wheelsprocket.xyz\/uk\/wp-json\/wp\/v2\/media?parent=2106"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wheelsprocket.xyz\/uk\/wp-json\/wp\/v2\/categories?post=2106"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wheelsprocket.xyz\/uk\/wp-json\/wp\/v2\/tags?post=2106"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}